CS 2301 - SOFTWARE ENGINEERING
TWO MARKS
UNIT I SOFTWARE PRODUCT AND PROCESS
1. What is software engineering?
Software engineering is a
discipline in which theories, methods and tools are applied to develop professional
software.
2. What is Software?
Software is nothing but a collection of computer programs that are related
documents that are indented to provide desired features, functionalities and
better performance.
3. What are the characteristics of the software?
* Software is engineered, not
manufactured.
* Software does not wear out.
* Most software is custom built rather than
being assembled from components.
4. What are the
various categories of software?
* System software
* Application software
* Engineering/Scientific software
* Embedded software
5. What are the
challenges in software?
* Copying with legacy systems.
* Heterogeneity challenge
* Delivery times challenge.
6. Define software
process.
Software process is defined as
the structured set of activities that are required to develop the software
system.
7. What are the
fundamental activities of a software process?
* Specification
* Design and implementation
* Validation
* Evolution
8. What are the
umbrella activities of a software process?
*
Software project tracking and control.
*
Risk management.
*
Software Quality Assurance.
*
Formal Technical Reviews.
*
Software Configuration Management.
*
Work product preparation and production.
*
Reusability management.
*
Measurement.
9. What are the merits of incremental model?
i) The incremental
model can be adopted when there is less number of people involved in the
project.
ii) Technical
risks can be managed with each increment.
iii) For a very
small time span, at least core product can be delivered to the customer.
10. List the task regions in the Spiral model.
* Customer
communication - it is suggested to establish customer communication.
* Planning – All
planning activities are carried out
* Risk analysis –
The tasks required to calculate technical and management risks.
* Engineering – tasks
required to build one or more representations of applications
* Construct and release – tasks required to
construct, test, install the applications
* Customer evaluation - tasks are performed
and implemented at installation stage based on the customer evaluation.
11. What are the drawbacks of spiral model?
i) It is based on
customer communication. If the communication is not proper then the software
product that gets developed will not be the up to the mark.
ii) It demands
considerable risk assessment. If the risk assessment is done properly then only
the successful product can be obtained.
12. What is System Engineering?
System Engineering
means designing, implementing, deploying and operating systems which include
hardware, software and people.
13. List the process maturity levels in SEIs CMM.
Level 1: Initial - Few processes are defined
and individual efforts are taken.
Level 2: Repeatable – To track cost
schedule and functionality basic project management processes are established.
Level 3: Defined – The process is standardized,
documented and followed.
Level 4: Managed – Both the
software process and product are quantitatively understood and controlled using
detailed measures.
Level 5: Optimizing – Establish
mechanisms to plan and implement change.
14. What is an effector process?
The effector
process is a process that verifies itself. The effector process exists in certain criteria.
15. Define the computer based system.
The computer based
system can be defined as “a set or an arrangement of elements that are
organized to accomplish some predefined goal by processing information”.
16. What does Verification represent?
Verification
represents the set of activities that are carried out to confirm that the
software correctly implements the specific functionality.
17. What does
Validation represent?
Validation
represents the set of activities that ensure that the software that has been built is satisfying the
customer requirements.
18. What are the steps followed in testing?
1) Unit testing - The individual
components are tested in this type of testing.
2) Module testing – Related
collection of independent components are tested.
3) Sub-system testing –Various
modules are integrated into a subsystem and the whole subsystem is tested.
4) System testing – The whole system
is tested in this system.
5)
Acceptance testing – This type of testing involves testing of the system with
customer data.
19. What is the use of CMM?
Capability Maturity Model is used
in assessing how well an organization’s processes allow to complete and
manage new software projects.
20. Name the Evolutionary process Models.
i. Incremental
model
ii.
Spiral model
iii. WIN-WIN
spiral model
iv. Concurrent Development
21. What is meant by Software engineering paradigm?
The development strategy that
encompasses the process, methods and tools and generic phases is often referred
to as a process model or software engineering paradigm.
22. What are the various elements for computer based system?
1. Software 2. Hardware
3. People 4. Database
5. Documentation 5. Procedures.
23. Define dynamic verification?
Dynamic
verification is performed during the execution of software and dynamically
checks its behavior.
24. Define static verification?
Static
verification is a process to check some requirements of software doing a